Large-Scale Logistics Gateway System for Xiaomi Distribution Park
High-Performance Spiral Door System for Large-Scale Logistics Gateway Applications
Project Overview
This project is installed at the external logistics gateway of the Xiaomi distribution park. The facility includes multiple loading and unloading bays, requiring a total of 39 HSD4322 high speed spiral doors arranged in a continuous row configuration.
The system is designed to support frequent vehicle access while maintaining thermal insulation and wind resistance under outdoor logistics conditions.
Challenge
Large-scale logistics facilities require consistent performance across multiple access points to ensure smooth and efficient cargo flow. The system must operate reliably under frequent opening cycles while maintaining environmental separation and resisting external wind pressure.
The challenge is to ensure uniform performance and stability across a large-scale deployment scenario.
LEFAST Solution
LEFAST deployed 39 sets of HSD4322 high speed spiral doors across the logistics park. The compact spiral structure allows stable operation in space-constrained installations while supporting high-frequency logistics access.
The system ensures consistent performance across all gateway points in the facility.
Results
The project establishes a unified high-performance access system across the logistics park. By combining thermal insulation, wind resistance, and high-frequency operation capability, the solution supports stable and efficient logistics operations at scale.
Products Used in This Project
Looking for a Similar Solution?
Our team can help develop a customized solution for your facility.